Carbon strip reinforcement in a car park in Paris
TES TECHNIFOR successfully completed 10,000 linear metres of carbon strip...
Follow our news through these projects.
Our latest project:
TES TECHNIFOR successfully completed 10,000 linear metres of carbon strip...
TES TECHNIFOR welcomed fifth-year students from ESITC Metz to our special...
TES TECHNIFOR completed an emergency reinforcement of 2,500 linear metres...
TES TECHNIFOR reinforced the vault of the Melpomène room at the École...
TES TECHNIFOR drilled 12 micropiles as part of the renovation of the...
TES TECHNIFOR completed the cutting and removal of 105 tonnes of concrete...