Definition
This method is required for land with small surface area. First, a vertical-walled excavation is made, then shoring of the pit to locate the building foundations. Subsequently, wells are dug to the depth adequate to safety standards. Finally, the wells are concreted. Note that this method is not recommended when there is a water table in the soil, or risk of collapse.