The Gondreville bridge is undergoing major rehabilitation. TES Technifor is working there to ensure its strength and longevity.
Spanning the Moselle since 1957, the Gondreville bridge has entered a spectacular and technical repair phase. A complex project, led by EIFFAGE Génie Civil, on a 130-metre structure, emblematic of the early days of prestressed concrete.
TES Technifor teams are mobilised to give this bridge a healthy and durable structure. Objective: enhanced safety, new waterproofing, new guardrails, and a second life for this essential link between the two banks.