TES TECHNIFOR carried out structural strengthening of six storage cells at a Groupe CAL agricultural silo in Gerbéviller.
TES TECHNIFOR recently worked on a Groupe CAL agricultural silo in Gerbéviller to strengthen six storage cells with a combined capacity of 3,000 tonnes.
From structural analysis and the design of the steel strengthening elements through to their installation on site, our teams provided technical oversight and coordinated the operation in a particularly constrained working environment.
A technically demanding project carried out in partnership with ACROTIR for work in areas with difficult access.