Catégorie : Micropile & Anchor Drilling

Grand Hôtel de la Reine: an exceptional project

Publié le back
Drilling and structural strengthening works at the Grand Hôtel de la Reine on Place Stanislas in Nancy, carried out by TES TECHNIFOR alongside France-Lanord & Bichaton. Drilling and structural strengthening works at the Grand Hôtel de la Reine on Place Stanislas in Nancy, carried out by TES TECHNIFOR alongside France-Lanord & Bichaton.
On a protected heritage site with challenging working conditions, TES TECHNIFOR is implementing drilling and structural strengthening solutions to adapt the foundations to the project’s requirements.

On Place Stanislas, TES TECHNIFOR is working on the Grand Hôtel de la Reine, a landmark of Nancy’s architectural heritage, alongside France-Lanord & Bichaton, the lead contractor of the consortium.

In this first video, Louis Germain (TES TECHNIFOR) and Jean-Christophe Loza (France-Lanord & Bichaton) present the project from outside the building, where our teams are carrying out drilling and structural strengthening works adapted to the site’s constraints.

Watch the video.

par TES Technifor