TES Technifor is carrying out sawing and core drilling of the Gondreville bridge to enable its lifting and repair.
To enable the lifting of part of the Gondreville bridge currently under repair, TES Technifor is carrying out precision sawing to cut it into several sections.
Our teams are also carrying out core drillings to create the anchor points needed for crane lifting.