In Hollerich (Luxembourg), TES Technifor carries out complex demolition with CLE
In Hollerich, Luxembourg, as part of a project led by CLE (Compagnie Luxembourgeoise d'Entreprises), our TES Technifor teams carried out a complex demolition operation, matching the scale of the project:
- 2 concrete facades completely dismantled
- A lift shaft demolished over 8 levels
- 330 m² of concrete slab removed
- 1,000 m² of masonry walls demolished
An impressive project, carried out with precision and control!