Mission accomplished in Metz: sawing, core drilling and structural reinforcement for Bouygues Bâtiment Nord-Est, with results meeting expectations.
Thank you to Bouygues Batiment Nord-Est for their trust in this ambitious project, which allowed TES Technifor to showcase its expertise and quality know-how.
This intervention included:
- Various concrete cuts across 6 levels,
- 250 m² of diamond cutting and sawing of concrete,
- 450 core drillings completed,
- Removal of 150 tonnes of concrete,
- In-depth surveys and structural diagnosis,
- Reinforcement studies and technical variant proposals,
- Reinforcement of 22 stair landings with carbon strips.