Catégorie : Structural Reinforcement

Carbon fabric reinforcement at Auchan Semécourt

Publié le back
Emergency strengthening works Emergency strengthening works
TES TECHNIFOR completed an emergency reinforcement of 2,500 linear metres in carbon fibre fabric for the strengthening of prestressed concrete purlins at the Auchan Semécourt site.

We completed 2,500 linear metres of carbon fibre fabric (CFF) reinforcement for the emergency strengthening of prestressed concrete purlins.

In collaboration with Demathieu Bard, this project involves reinforcing 220 prestressed concrete purlin ends, following the incident on 22 April 2017 at the Auchan Semécourt site.

This complex project required our expertise for technical advice, studies and night-time installation of the 2,500 linear metres of carbon fabric required. We used unidirectional carbon fibre fabric with low crimp, thus ensuring a high elastic modulus.

par Tes TECHNIFOR

Reports

Carbon Fiber Fabric Reinforcement - Auchan Semécourt Metz

Carbon Fiber Fabric Preparation - Auchan Semécourt Metz
Carbon Fiber Fabric Preparation - Auchan Semécourt Metz
Wet process preparation of low crimp unidirectional carbon fiber fabric
Carbon Fiber Fabric Installation - Auchan Semécourt Metz
Carbon Fiber Fabric Installation - Auchan Semécourt Metz
Installation of low crimp unidirectional carbon fiber fabric
Carbon Fiber Fabric Installation - Auchan Semécourt Metz
Carbon Fiber Fabric Installation - Auchan Semécourt Metz
Carbon Fiber Fabric Preparation - Auchan Semécourt Metz
Carbon Fiber Fabric Preparation - Auchan Semécourt Metz